• Image 0

    Get the inside story
    on Zeta-pdm's
    separation technology

    Read more
  • Image 1


    Separation solutions
    built to last a lifetime

    Read more
  • Image 2

    With a no failure record,
    Zeta-pdm's technology
    speaks for itself

    Read more
  • Image 3

    Our 'whole lifecycle'
    approach is trusted by
    leading global players

    Read more

Zeta-pdm recently attended a prestigious industry reception at the House of Commons.

Business development manager, Scott Constantine, made his way to Westminster for the annual UK Offshore Oil & Gas Industry All Party Parliamentary Group event.

The reception, held within the House of Commons’ Terrace Pavilion, provided the opportunity for representatives from the Government and all political parties to hear the views of the sector.

Scott commented: “It was great to once again be invited along to the oil and gas reception at the House of Commons. The sector plays such a major role in the wider UK economy that it’s essential that our politicians engage directly with those who work within the industry.”

Case Studies

Slug Catcher Flow Assurance

Gas production systems may operate in the "slug flow" multiphase regime in which large volumes of liquid are interspersed with the gas. Under these conditions, the arrival of the liquid slugs can be detrimental to separation performance and the mechanical stress levels are greatly increased. In the example shown below, Zeta-pdm was asked to analyse the failure of a slug catcher vessel. Inspection showed that the slugs had caused mechanical failure of the separation internals. Subsequently, a simulation study yielded a vastly improved understanding of the flow behaviour, enabling Zeta-pdm to recommend internals better able to withstand severe operating conditions.

Read more ...
EIC Fpal Fpal Achilles Zeta-pdm Ltd are ISO 9001, 14001 and 18001 certified