• Image 0

    Get the inside story
    on Zeta-pdm's
    separation technology

    Read more
  • Image 1


    Separation solutions
    built to last a lifetime

    Read more
  • Image 2

    With a no failure record,
    Zeta-pdm's technology
    speaks for itself

    Read more
  • Image 3

    Our 'whole lifecycle'
    approach is trusted by
    leading global players

    Read more

Petronas Carigali SDN BHD (PCSB) operates the Resak Platform which is located within Block PM-6 approximately 135km northeast of Kertih. Production from the gas field commenced in January 2000 and is expected to peak at 400 MMSCFD of gas and 13,000 bpd of condensate and will supply about 15 percent of the anticipated natural gas demand in Peninsular Malaysia.

Petronas carigali experienced severe liquid carry-over from their production separators and as part of this project, Zeta-pdm Ltd undertook the design, engineering, supply and installation supervision, of the separation internals for the revamp & upgrade of the two (2) off existing vertical Production Separators V2020 & V2070.

Download the Case Study

Latest News

Energy industry specialist joins forces with engineering and management consultant

Leading energy industry specialist Zeta-pdm Ltd has formed a collaborative alliance with an engineering and management consultancy company.

Read more ...
EIC Fpal Fpal Achilles Zeta-pdm Ltd are ISO 9001, 14001 and 18001 certified