Located in the Kazakhstan sector of the Caspian Sea the Kashagan field extends over an area of approx. 75x45 km.

Given it's size and technical complexity, the field will be developed in phases.

For Phase I, the Experimental Programme production is targeted at 75,000 barrels per day building to 300,000 bpd under Phase II and ramping up to 1.5 million bpd under Phase III by 2021.

A consortium of seven partners known as Agip KCO, act as a single operator. In 2007, certain separation vessels were de-bottlenecked due to the existing internals not being able to meet the required performance levels.

As part of this project Zeta-pdm Ltd undertook the design, engineering, supply and installation supervision, of the separation internals for the revamp & upgrade of four (4) off existing separators; the Two (2) off horizontal HP Separators B4-200-VS-101 / 201 and the two (2) off vertical HP Knock-out (KO) Drums B4-200-VN-101 / 201.

Download the Case Study

Latest News

Energy industry specialist joins forces with engineering and management consultant

Leading energy industry specialist Zeta-pdm Ltd has formed a collaborative alliance with an engineering and management consultancy company.

Read more ...
EIC Fpal Fpal Achilles Zeta-pdm Ltd are ISO 9001, 14001 and 18001 certified