• Image 0

    Get the inside story
    on Zeta-pdm's
    separation technology

    Read more
  • Image 1


    Separation solutions
    built to last a lifetime

    Read more
  • Image 2

    With a no failure record,
    Zeta-pdm's technology
    speaks for itself

    Read more
  • Image 3

    Our 'whole lifecycle'
    approach is trusted by
    leading global players

    Read more

The Harding field lies in the UKCS licence block 9/23b in the Central North Sea, some 320 km northeast of Aberdeen.

The field was discovered in 1987 at a depth of approx. 1,850 m below the seabed, in a water depth of 110 m; it covers an area of approx. 20 square kilometres.

As part of this project, Zeta-pdm Ltd undertook the design, engineering, full mock build, supply and installation supervision, of the separation internals for the revamp & upgrade of the existing 1st Stage Separator V-101.

Download the Case Study

Latest News

Energy industry specialist joins forces with engineering and management consultant

Leading energy industry specialist Zeta-pdm Ltd has formed a collaborative alliance with an engineering and management consultancy company.

Read more ...
EIC Fpal Fpal Achilles Zeta-pdm Ltd are ISO 9001, 14001 and 18001 certified