• Image 0

    Get the inside story
    on Zeta-pdm's
    separation technology

    Read more
  • Image 1


    Separation solutions
    built to last a lifetime

    Read more
  • Image 2

    With a no failure record,
    Zeta-pdm's technology
    speaks for itself

    Read more
  • Image 3

    Our 'whole lifecycle'
    approach is trusted by
    leading global players

    Read more

The main Gullfaks field lies in block 34/10 in the northern part of the Norwegian North Sea and contains three large concrete production platforms (Gulfaks A, B and C); with production starting on B on 29 February 1988.

Oil and gas from Gullfaks B is transferred to the A and C platforms for processing, storage and export.

The recovery factor on Gullfaks is 59 per cent, but the goal is to increase into 62 per cent. Also, in order to minimise the impact on the environment, Statoil looked at ways to reduce the oil emissions in the produced water.

As part of this project, Zeta-pdm Ltd undertook the design, engineering and supply of the separation internals for the revamp & upgrade of the existing two (2) off existing Produced Water Separators / Degassing Tanks 44-VA21 A/B to cover an increase in water throughput.

Download the Case Study

Latest News

Energy industry specialist joins forces with engineering and management consultant

Leading energy industry specialist Zeta-pdm Ltd has formed a collaborative alliance with an engineering and management consultancy company.

Read more ...
EIC Fpal Fpal Achilles Zeta-pdm Ltd are ISO 9001, 14001 and 18001 certified