• Image 0

    Get the inside story
    on Zeta-pdm's
    separation technology

    Read more
  • Image 1


    Separation solutions
    built to last a lifetime

    Read more
  • Image 2

    With a no failure record,
    Zeta-pdm's technology
    speaks for itself

    Read more
  • Image 3

    Our 'whole lifecycle'
    approach is trusted by
    leading global players

    Read more

Ekofisk 2/4 J has become the central platform in the Ekofisk area in the Norwegian sector of the Central North Sea.

When 2/4 J became fully operational, a number of platforms started to be decommissioned. Production from third party fields such as Valhall, Gyda and Ula were merged at 2/4 J and then piped to Emden and Teesside.

During increased production and when flaring on the Ekofisk 2/4 J Platform via the HP Flare KO Drum J-95-00047, problems with "liquid carry-over" to the flare were experienced.

As part of this project, Zeta-pdm Ltd undertook the design, engineering, full trail assembly, supply and installation supervision, of the separation internals for the revamp & upgrade of the existing horizontal HP Flare Knock-out Drum J-95-00047.

Download the Case Study

Latest News

Energy industry specialist joins forces with engineering and management consultant

Leading energy industry specialist Zeta-pdm Ltd has formed a collaborative alliance with an engineering and management consultancy company.

Read more ...
EIC Fpal Fpal Achilles Zeta-pdm Ltd are ISO 9001, 14001 and 18001 certified