• Image 0

    Get the inside story
    on Zeta-pdm's
    separation technology

    Read more
  • Image 1


    Separation solutions
    built to last a lifetime

    Read more
  • Image 2

    With a no failure record,
    Zeta-pdm's technology
    speaks for itself

    Read more
  • Image 3

    Our 'whole lifecycle'
    approach is trusted by
    leading global players

    Read more

Cabinda Gulf Oil Company Ltd; a subsidiary of Chevron Corporation operates the the BBLT Development, located approximately 50 miles (80 kilometers) offshore in appprox. 1,300 feet (396 meters) of water. The project is being developed in two phases.

Phase 1 - Benguela Belize (BB), combines an integrated drilling and production platform hub facility supported by a compliant piled tower; the compliant piled tower is the first application of this structural technology outside the U.S. Gulf of Mexico.

Phase 2 - Lobito Tomboco (LT) will produce via sub-sea wells tied into the central production hub.

As part of this project, Zeta-pdm Ltd undertook the design, engineering, trial assembly and supply of the new separation internals for fifteen (15) off separator vessels, eleven (11) horizontal separators and four (4) vertical scrubbers. The supply covered many different types of processes and as such a range of internals was used on this project.

Download the Case Study

Latest News

Energy industry specialist joins forces with engineering and management consultant

Leading energy industry specialist Zeta-pdm Ltd has formed a collaborative alliance with an engineering and management consultancy company.

Read more ...
EIC Fpal Fpal Achilles Zeta-pdm Ltd are ISO 9001, 14001 and 18001 certified